US25W at KY 204 intersection will be closed starting Friday (April 14) at 5 p.m.
The Kentucky Transportation Cabinet (KYTC) advises motorists that District 11 crews will begin a culvert installation phase on US25W (mile point 18.739) in Whitley County on Friday (April 14).
Preparation for the culvert replacement work will include US25W being closed at the intersection of KY 204 along with Airport Road. The closure will begin Friday (April 14) at 5 p.m., and will reopen on Monday (April 17) at 5 a.m.
Motorists will not be allowed to advance through work zone once the closure takes place on Friday (April 14) until it reopens on Monday (April 17). Detour signing will be placed for motorists.
KYTC asks motorists to be aware of the work zone, expect delays, and to utilize safe driving habits when traveling through the area.
The date, time, and duration of work may be adjusted if inclement weather or other unforeseen delays occur. Motorists can access travel and traffic conditions at http://goky.ky.gov or contribute their reports at www.waze.com or via the Waze mobile application. You can also get traffic information for District 11 counties at www.facebook.com/KYTCDistrict11 or by following us on Twitter at www.twitter.com/KYTCDistrict11.








