cost recovery surcharge.
Federal, state, and local environmental regulations require KU to build and upgrade equipment and
facilities to operate in an environmentally sound manner. Specifically, KU is seeking Commission approval of Certificates of Public Convenience and Necessity (“CPCN”) to construct new Particulate Matter Control Systems to serve all units at the Ghent Generating Station in Ghent, Kentucky, and to serve all units at the E.W. Brown Generating Station in Burgin, Kentucky, to comply with the national emissions standards for hazardous air pollutants proposed by the U.S. Environmental Protection Agency (“EPA”). The Particulate Matter Control Systems are also being installed to comply with EPA-imposed sulfuric acid mist and opacity requirements. Additionally, KU is seeking recovery of costs
associated with these environmental projects, which are necessary for compliance with the federal Clean Air Act, the federal Resource Conservation and Recovery Act, and other current or proposed environmental laws and regulations, and enforcement actions. These additional projects primarily relate to installing Particulate Matter Control Systems to serve all units at the Ghent Generating Station, installing Particulate Matter Control Systems to serve all units at the E.W. Brown Generating Station, converting the main coal combustion residuals treatment basin at the E.W. Brown Generating Station to a landfill and other pollution control facilities. The capital cost of the new pollution control facilities for which KU is seeking recovery at this time is estimated to be $1.1 billion. Additional operation and maintenance expenses will be incurred for these projects and are costs that KU is requesting to recover through the environmental surcharge in its application.
The impact on KU’s customers is estimated to be a 1.5% increase in 2012 with a maximum increase of 12.2% in 2016. For a KU residential customer using 1,000 kilowatt hours per month, the initial monthly increase is expected to be $1.13 during 2012, with the maximum monthly increase expected to be $9.46 during 2016.
The Environmental Surcharge Application described in this Notice is proposed by KU. However, the
Public Service Commission may issue an order modifying or denying KU’s Environmental Surcharge Application. Such action may result in an environmental surcharge for consumers other than the environmental surcharge described in this Notice.
Any corporation, association, body politic or person may, by motion within thirty (30) days after publication, request leave to intervene in Case No. 2011-00161. That motion shall be submitted to the Public Service Commission, 211 Sower Blvd., P.O. Box 615, Frankfort, Kentucky, 40602, and shall set forth the grounds for the request including the status and interest of the party. Intervenors may obtain copies of the Application and testimony by contacting Kentucky Utilities Company at 220 West Main Street, Louisville, Kentucky, 40202, Attention: Lonnie E. Bellar, Vice President, State Regulation and Rates. A copy of the Application and testimony will be available for public inspection on KU’s website (http://www.lge-ku.com) and at KU’s offices where bills are paid after June 1, 2011.