{"version":"1.0","provider_name":"The News Journal","provider_url":"https:\/\/qa.thenewsjournal.net","title":"Legal Notices for 9-2-20 &ndash; The News Journal","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"vpygkL9tMW\"><a href=\"https:\/\/qa.thenewsjournal.net\/legal-notices-for-9-2-20\/\">Legal Notices for 9-2-20<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/qa.thenewsjournal.net\/legal-notices-for-9-2-20\/embed\/#?secret=vpygkL9tMW\" width=\"600\" height=\"338\" title=\"&#8220;Legal Notices for 9-2-20&#8221; &#8212; The News Journal\" data-secret=\"vpygkL9tMW\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script type=\"text\/javascript\">\n\/* <![CDATA[ *\/\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/* ]]> *\/\n<\/script>\n","description":"NOTICE: P&amp;K Pizza, LLC, 37 South Park Center, Ste. 12, Corbin, KY 40701 hereby declares intentions to apply for a NQ4 Retail Malt Beverage Drink license no later than September 14, 2020. The business to be licensed will be located at 1038 Cumberland Falls Hwy., Corbin, Ky 40701 doing business as Heavenly Pizza. The owner is Kim Anderkin of 701 Laurel River Rd., London, KY 40744. Any person, association, corporation, or body politic may protest the granting of the license(s) by writing the Dept. of Alcoholic Beverage Control, 1003 Twilight Trail, Frankfort, KY 40601-8400, within 30 days (KRS 243.430) of the date of this legal publication. &nbsp; NOTICE TO MELISSA ANN SCHWARTZ To, Melissa Ann Schwartz, I have been appointed as Warning Order Attorney to notify you of Civil Action No. 20-AD-00043, Reta Gail Lowe vs. Melissa Ann Schwartz, Whitley Circuit Court. You have fifty (50) days from August 17, 2020 to file an answer or other pleadings in this case, or judgment may be taken against you. DAVID O. SMITH, ATTORNEY AT LAW PO BOX 699, CORBIN, KY 40701 \u2022 606.528.5001 &nbsp; NOTICE OF BOND RELEASE Permit# 918-0470 In accordance with KRS 350.093, notice is hereby given that Alden Resources LLC, 332 West Cumberland Gap Parkway, Suite 100, Corbin, KY 40701, has filed for a Phase III Bond Release on Increment1 No. 1 of permit number 918-0470 which was last issued on June 6th 2016. The application covers an area of approximately 109.8 surface and 114.60 underground\/auger acres for a total of 224.40 acres located approximately 0.7 mile south of Johnny Hollow Road\u2019s intersection with KY Hwy 26 and on the waters of Watts Creek.\u00a0 The operation is further located 1.5 miles north of the community of Rockholds in Whitley County, Kentucky. The bonds now in effect are as follows: Increment one (1) is a Surety Bond in the amount of $332,800.00. Approximately 100% of the original bond amount of $332,800.00 is included in this application for release. Reclamation work performed includes: Backfilling, re-grading, topsoil replacement, and drainage control including soil preparation and initial seeding and mulching in accordance with the approved reclamation plan, completed in October 2015. Written comments, objections, and requests for a public hearing of informal conference must be filed with the Director, Division of Field Services, 300 Sower Boulevard, 2nd Floor, Frankfort, KY 40601, by 10\/9\/2020. A public hearing on the application has been scheduled for 10\/12\/2020 at 9:00 am at the Department for Surface Mining Reclamation and Enforcement\u2019s Middlesboro Regional Office, 1804 East Cumberland Avenue, Middlesboro, KY 40965-1229. The hearing will be cancelled if no request for a hearing or informal conference is received by 101\/9\/2020. &nbsp; NOTICE OF BOND RELEASE Permit# 918-0413 In accordance with KRS 350.093, notice is hereby given that Alden Resources LLC, 332 West Cumberland Gap Parkway, Suite 100, Corbin, KY 40701, has filed for a Phase III Bond Release on Increments No. 1, and 3 of permit number 918-0413 which was last issued on May 20th 2014. The application covers an area of approximately 128.96 surface acres located approximately three (3) miles north of the community of Nevisdale, Kentucky, in Whitley County, Kentucky.\u00a0 The proposed operation is approximately two and half (2.5) miles north of Rock Springs Road intersection with Kentucky Highway 904 and 0.1 mile south east of Rock Springs Road intersection with Hamlin Hollow Road just south of Mulberry Creek. The bonds now in effect are as follows: Increment one (1) is a Surety Bond in the amount of $231,100.00. Approximately 100% of the original bond amount of $231,100.00 is included in this application for release. Increment three (3) is a Surety Bond in the amount of $10,000.00. Approximately 100% of the original bond amount of $10,000.00 is included in this application for release. Reclamation work performed includes: Backfilling, re-grading, topsoil replacement, and drainage control including soil preparation and initial seeding and mulching in accordance with the approved reclamation plan, completed in March 2014. Written comments, objections, and requests for a public hearing of informal conference must be filed with the Director, Division of Field Services, #300 Sower Boulevard, 2nd Floor, Frankfort, KY 40601, by 10\/9\/2020. A public hearing on the application has been scheduled for 10\/12\/82020 at 11:00 am the Department for Surface Mining Reclamation and Enforcement\u2019s Middlesboro Regional Office, 1804 East Cumberland Avenue, Middlesboro, KY 40965-1229. The hearing will be cancelled if no request for a hearing or informal conference is received by 10\/9\/2020. &nbsp; NOTICE OF BOND RELEASE Permit# 918-0476 In accordance with KRS 350.093, notice is hereby given that Alden Resources LLC, 332 West Cumberland Gap Parkway, Suite 100, Corbin, KY 40701, has filed for a Phase II Bond Release on Increment 1, and a Phase II &amp; III Bond Release on Increment 3 of permit number 918-0476 which was last issued on 7\/8\/2019. The application covers an area of approximately 229.12 acres located approximately 0.8 miles northwest of KY 779 junction with KY 3423 and located 2.2 miles northwest of the confluence of an un-named tributary of Meadow Creek in Whitley County, Kentucky.\u00a0 The operation is further located 3.9 miles southeast of Rockholds, Kentucky. The bonds now in effect are as follows: Increment one (1) is a Surety Bond in the amount of $152,100.00. Approximately 25% of the original bond amount of $152,100.00 is included in this application for release. Increment three (3) is a Surety Bond in the amount of $109,900.00. Approximately 25% of the original bond amount of $109,900.00 is included in this application for release. Reclamation work performed includes: Backfilling, re-grading, topsoil replacement, and drainage control including soil preparation and initial seeding and mulching in accordance with the approved reclamation plan, completed March 2018. Written comments, objections, and requests for a public hearing of informal conference must be filed with the Director, Division of Field Services, 300 Sower Boulevard, 2nd Floor, Frankfort, KY 40601, by 10\/9\/2020. A public hearing on the application has been scheduled for 10\/12\/2020 at 10:00 am the Department for Surface Mining Reclamation and Enforcement\u2019s Middlesboro [&hellip;]"}