<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>The News Journal</provider_name><provider_url>https://qa.thenewsjournal.net</provider_url><title>Legal Notices for 7-18-18 &ndash; The News Journal</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content" data-secret="cYSDkgYa0c"&gt;&lt;a href="https://qa.thenewsjournal.net/legal-notices-for-7-18-18/"&gt;Legal Notices for 7-18-18&lt;/a&gt;&lt;/blockquote&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://qa.thenewsjournal.net/legal-notices-for-7-18-18/embed/#?secret=cYSDkgYa0c" width="600" height="338" title="&#x201C;Legal Notices for 7-18-18&#x201D; &#x2014; The News Journal" data-secret="cYSDkgYa0c" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;&lt;script type="text/javascript"&gt;
/* &lt;![CDATA[ */
/*! This file is auto-generated */
!function(d,l){"use strict";l.querySelector&amp;&amp;d.addEventListener&amp;&amp;"undefined"!=typeof URL&amp;&amp;(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&amp;&amp;!/[^a-zA-Z0-9]/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),o=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),c=new RegExp("^https?:$","i"),i=0;i&lt;o.length;i++)o[i].style.display="none";for(i=0;i&lt;a.length;i++)s=a[i],e.source===s.contentWindow&amp;&amp;(s.removeAttribute("style"),"height"===t.message?(1e3&lt;(r=parseInt(t.value,10))?r=1e3:~~r&lt;200&amp;&amp;(r=200),s.height=r):"link"===t.message&amp;&amp;(r=new URL(s.getAttribute("src")),n=new URL(t.value),c.test(n.protocol))&amp;&amp;n.host===r.host&amp;&amp;l.activeElement===s&amp;&amp;(d.top.location.href=t.value))}},d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",function(){for(var e,t,s=l.querySelectorAll("iframe.wp-embedded-content"),r=0;r&lt;s.length;r++)(t=(e=s[r]).getAttribute("data-secret"))||(t=Math.random().toString(36).substring(2,12),e.src+="#?secret="+t,e.setAttribute("data-secret",t)),e.contentWindow.postMessage({message:"ready",secret:t},"*")},!1)))}(window,document);
/* ]]&gt; */
&lt;/script&gt;
</html><description>NOTICE OF BOND RELEASE In accordance with KRS 350.093, notice is hereby given that Mountainside Coal Co., Inc., 7692 S. HWY 25W, Williamsburg, KY 40769 has applied for a Phases II Bond Release on Increments 1,2, 4 and 5 of Permit Number 861-0528. The application covers an area of Approximately 318 acres of surface area located approximately twelve (12) miles northeast of the city of Williamsburg, KY and 1 mile east of the confluence of Flat Creek and Meadow Creek in Whitley County. The permit area is approximately 1.16 miles southeast of the intersection of Hwy. 1418 (Flat Creek Road) and Hwy. 779. The latitude is 36&#xB0; 48&#x2019; 52&#x201D;N and the longitude is 84&#xB0; 00&#x2019; 53&#x201D;W. The bonds now in effect are as follows: Increment 1 is a Letter of Credit in the amount of $80,600.00, Increment 2 is a Letter of Credit for $103,800.00, Increment 4 is a letter of Credit for $58,000.00, and Increment 5 is a Letter of Credit for $92,500.00. Reclamation work performed includes: Backfilling, grading, fertilizing, seeding, mulching and tree planting. Reclamation was completed September 2016. Written comments, objections or requests for a public or informal conference must be filed with the Director, Division of Field Services, 300 Sower Boulevard, Frankfort, KY 40601, by August 17, 2018. This is the final advertisement of the application. A public hearing on the application has been scheduled for 9:00 AM on August 20, 2018 at the Department for Surface Mining Reclamation and Enforcement&#x2019;s Middlesboro Regional Office, 1804 East Cumberland Avenue, Middlesboro, KY 40965-1229. The hearing will be cancelled if no request for hearing or informal Conference is received by: August 17, 2018.&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0;&#xA0; &#xA0; NOTICE OF BOND RELEASE In accordance with KRS 350.093, notice is hereby given that Clear Energy Corporation, P.O. Box 1385 LaFollette, TN 37766 has applied for a Phase III Bond Release on increments No&#x2019;s 1 and 2 of Permit 918-0446 which was last issued on April 06, 2015. The application covers an area of approximately 80.8 acres located 1.2 miles Northeast of the community of Rockholds in Whitley County, Kentucky. The permit area is approximately 1.1 miles Northeast of Watts Creek and 1.0 miles Northeast of Colonel Hollow Road&#x2019;s intersection with Highway 26. The latitude is 36 degrees, 50 minutes and 34 seconds. The longitude is 84 degrees, 06 minutes and 17 seconds. The bonds now in effect are as follows: Increment one (1) is a Surety Bond in the amount of $75,000.00. Increment two (2) is a Surety Bond in the amount of $67,100.00. Reclamation work performed includes: Backfilling, grading and regrading, drainage control including initial seeding and mulching, and tree planting of disturbed and graded areas in accordance with the approved reclamation plan that was completed on 1/15/2016. Written comments, objections and request for a public hearing or informal conference must be filed with the Director, Division of Field Services, 300 Sower Blvd., Frankfort, Kentucky 40601 by August 24, 2018. A public hearing on the application has been scheduled for August 27, 2018 at 9:00 A.M. at the Department for Surface Mining and Reclamation and Enforcement&#x2019;s Middlesboro Regional Office, 1804 East Cumberland Avenue, Middlesboro, Kentucky 40965-1229. The hearing will be cancelled if no request for hearing or informal conference is received by August 24, 2018. &#xA0; NOTICE OF BOND RELEASE Permit # 918-0476 In accordance with KRS 350.093, notice is hereby given that Alden Resources LLC, 332 West Cumberland Gap Parkway, Suite 100, Corbin, KY 40701, has filed for a Phase I Bond Release on Increments 1, 2 and 3 of permit number 918-0746 which was last issued on February 23rd 2018. The application covers an area of approximately 228.70 acres located approximately 0.8 miles northwest of KY 779 junction with KY 3423 and located 2.2 miles northwest of the confluence of an un-named tributary of Meadow Creek in Whitley County, Kentucky. The operation is further located 3.9 miles southeast of Rockholds, Kentucky. The bonds now in effect are as follows: Increment one (1) is a Surety Bond in the amount of $152,100.00. Approximately 60% of the original bond amount of $152,100.00 is included in this application for release. Increment two (2) is a Surety Bond in the amount of $189,500.00. Approximately 60% of the original bond amount of $189,500.00 is included in this application for release. Increment three (3) is a Surety Bond in the amount of $109,900.00. Approximately 60% of the original bond amount of $109,900.00 is included in this application for release. Reclamation work performed includes: Backfilling, re-grading, topsoil replacement, and drainage control including soil preparation and initial seeding and mulching in accordance with the approved reclamation plan, completed March 2018. Written comments, objections, and requests for a public hearing of informal conference must be filed with the Director, Division of Field Services, 300 Sower Boulevard, 2nd Floor, Frankfort, KY 40601, by August 4, 2018. A public hearing on the application has been scheduled for September 4, 2018 at 9:00 am the Department for Surface Mining Reclamation and Enforcement&#x2019;s Middlesboro Regional Office, 1804 East Cumberland Avenue, Middlesboro, KY 40965-1229. The hearing will be cancelled if no request for a hearing or informal conference is received by August 31, 2018. &#xA0; NOTICE OF RENEWAL OF BLASTING SCHEDULE Clay Laurel Mining, Inc., PO Box 25, Avawam, KY 41713, telephone number (606) 483-6884, gives notice that blasting operations will be conducted on its coal mine permit number 918-0498, covering 45.60 acres. Latitude: 36&#xB0; 40&#x2019; 54&#x201D;, Longitude: 83&#xB0; 55&#x2019; 26&#x201D; The proposed operation is located approximately located 0.57 miles east from KY 92&#x2019;s junction with Limestone Branch Road and located 2.0 miles southeast of Siler in Whitley County Kentucky. Blasting operations are currently scheduled from August 2017 through August 2018. Blasting operations will continue August 2018 through August 2019. Blasting will be conducted between sunrise and sunset except in emergency situations. Emergency situations include, but are not limited to, lightning, the imminent threat of lightning, or other circumstances that require unscheduled detonation for the safety of the public or miners. Any major alterations to [&hellip;]</description></oembed>
